Projects

Name: DCT RE-ENGINEERING Pier 2 (2008 - 2009)


Description: Civil Engineering: Bulk Earthworks,Layerworks,Asphalting, Stormwater, Sewer, Watermains and Cable Ducts over 142000m^2

 

Name: DCT RE-ENGINEERING DCT TRUCK STAGING (2007 - 2008)


Description: Civil Engineering: Bulk Earthworks,Layerworks,Asphalting, Stormwater, Sewer, Watermains and Cable Ducts over 65000m^2

 

Name: Francoius Road Sports Facility (2007)


Description: Construction of an International Artificial Grass Playing surface for hockey, Floodlighting, Irrigation design and installation,precise level construction of
layerworks and asphalt pavement, fencing, highmast lighting,importation and installation of Tiger Turf (UK).Building construction to change rooms and finishes.

 

Pier 1Name: Reconstruction of Pier 1 Durban Harbour (2006-2007)


Description: Civil Engineering: Bulk Earthworks,Layerworks,Asphalting, Stormwater, Sewer, Watermains and Cable Ducts , Impact Rolling over 226 000 m^2 of area.

 

 

 

BuffesdraaiName: Buffesdraai Waste Transfer Station (2006)


Description: Waste Transfer Center 9500 m^2 of concrete roads, 2x Weighbridges,Control Room , Administration block, Ablutions and changerooms,Associated infrastructure of Ashalt roads kerbings and stormwater.

 

 

Name: King George V Hospital - Bulk Earthworks (Phase B)(2005) King George


Description: Infrastructure development incorporating. Bulk Earthworks, Rock blasting, Platform Construction, Road Construction,Stormwater,Sewer,Watermains, Concrete retaining walls,Concrete pedestrian bridge,Vertical dry stack walls, with tie backs and soil pinning. Pallasade Fencing

 

ACSAName: Extention to B Car Park at Durban International Airport (2005)


Description: Construction of Asphalt Car Park with associated earthworks, layerworks and drainage

 

 

Name: Upgrading of Bellair Road, Phase 2B Wiggans Road to Jan Smuts Highway (2004)


Description: Road widening and reconstruction to existing major road.Bulk Earthworks,Stormwater, Asphalt Paving , Stabilised crusher-run Layers ,Brick retaining walls, traffic accomodation

 

Name: Riverhorse Valley Business Estate Hippo Park Avenue Phase 1 (2004)


Description: Construction of two Asphalt Roads with associated layerworks abd bulkearthworks, roads, sewer pumpstation, stormwater drainage, sewer drainage,concrete retaining walls.